Eliminating chronic rotating equipment vibration at the structural root. ACC provides Alphatec Engineering's proprietary high-performance epoxy grouts (ALPHATEC® 800 / AT808 / AT130), 300-bar sub-surface resin injection, in-situ anchor bolt replacement, and Motion Amplification® diagnostics.
Engineered specifically for heavy rotating machinery subjected to dynamic cyclic fatigue, chemical immersion, and severe vibration shocks.
High-performance epoxy grout designed for dynamic reciprocating compressors, gas/steam turbines, and heavy multi-stage pumps. Exceptional tensile bonding to concrete and steel soleplates with high vibration damping.
Ultra-low viscosity version formulated for narrow clearances (down to 10 mm), deep under-skid pockets, anchor bolt sleeves, and precision soleplate grouting where high fluidity is critical.
Engineered specifically for elevated temperature industrial installations such as steam turbines, gas turbines, and hot heat exchanger supports enduring continuous thermal cycles without softening.
Specialized structural epoxy resin with high wetting capability, injected under high pressure into internal concrete fissures, cold joints, and delaminations to rebond fractured plinths into monolithic blocks.
Comprehensive civil-mechanical remediation performed without removing heavy machinery, eliminating weeks of unnecessary plant downtime.
When a compressor foundation suffers oil soaking, crumbled cementitious grout, or cracked concrete plinths, traditional civil contractors often recommend full foundation demolition—requiring complete equipment dismantling and months of lost production.
Alphatec's proprietary in-situ methodology repairs the foundation directly underneath the operating or temporarily shut equipment:
Traditional vibration spectrum analysis tells engineers that a machine is shaking, but often fails to explain why. Is the vibration caused by rotor unbalance, piping strain, loose soleplates, or a fractured concrete foundation?
ACC utilizes Alphatec's Motion Amplification® high-speed video diagnostics to transform millions of camera pixels into individual vibration sensors:
Documented case studies from official company records across major petrochemical, refining, LNG, and power facilities.
LNG Terminal
New installation of 4 critical Boil-Off Gas compressors (Model 32HF-4N-CM, 12,600 kg/h) requiring void-free structural stability.
Refinery
Original 1970s foundation suffered multiple cold joints, severe oil penetration, and loose anchor bolts under 950 kW motor.
Power Generation
Mitsubishi-MAN 18V52/55B generator engine suffered chronic bolt shearing and vibration from oil-degraded concrete.
Combined Cycle Power
GT1A gas turbine failure damaged pedestals; internal anomalies and fissures confirmed by non-destructive testing inside the mat.